We followed this query up with the relevant departments at county hall and we are pleased to confirm that the engineer has assured us that a replacement handrail is to be installed as soon as possible:
Councillors
This scheme was undertaken as
part of our DCC Terrier Unadopted works.
I have spoken to our Design team
who will design a new handrail and have it installed as soon as possible.
Regards, Jonathan
Jonathan Cardy
Engineer – Capital Programme