Friday, 23 September 2022

Pothole repairs scheduled for Park Avenue

Last week, at the request of residents in Park Avenue, I reported potholes in a number of different locations in the back lane between Park Avenue and The Crescent in Blackhall Colliery. 

In doing so I asked the highways section at DCC to carry out an inspection of the lane to determine the extent of damage and to carry out repairs where necessary.

I’ve received confirmation this morning from the highways team that following an inspection earlier this week the road surface is sufficiently damaged to warrant repairs. I’ve been advised that on this occasion repairs should carried out within the next 14 days.

If you are aware of any similar issues in your street you can either report them direct to the council at: https://doitonline.durham.gov.uk/ or if you prefer you can let me know and I’ll make arrangements for an inspection: rob.crute@durham.gov.uk

Please note that all inspections are carried out by highways inspectors and decisions on repairs are based on the inspector’s assessment of the extent of damage at a specific location.