I have been informed by the engineers that they believe now that any gully blockage on the south-bound carriageway at Chicken's Green may have an effect on flooding on the opposite side of the road. It is hoped that once these ongoing works are completed it may no longer be necessary to install drains at Emmerson Court as originally thought. However I am assured that this work will be carried out if required.
Drain clearance works at Chicken's Green in June 2013 |